top of page

Select a Market Sector:

Data Centres & Logistics

Services

LEEAD Consulting has been involved in several Data Center projects, setting up advanced solutions for: Financial Institutions such as the Informatics and Management Centre for the National Bank of Greece and the Data Center for Piraeus Bank in Athens, as well as the Headquarters for Telecommunication giants such as Vodafone.

Architectural Design & Planning

• Conceptual Designs

• Project Identification, Studies & Surveys
• Preliminary Study
• Design Development
• Tender Documentation
• Detail Design Elaboration
• Final Designs
• Elaboration of Tender Documents
• Interior Design
• Construction Drawings
• Construction Supervision
• Technical Assistance during Construction
• Environmental Assessments
• Staff Training  Transfer of Know-how
• Commissioning and trial operation of works

Structural Engineering
• Feasibility Studies
• Procurement
• Commissioning
• Project Budgeting
• Operation & Maintenance Planning
• Auditing & Due Diligence
• Project Management

Mechanical & Electrical Engineering

• HVAC, Plumbing & Irrigation
• Fire Protection
• Electrical (Power, Lighting, Ultra low voltage)
• People Conveying Systems
• Lightning Protection (earthing)

• Security Systems & Building Controls​

Download Brochure

PDF (2.1MB)

​Featured Projects

National Bank of Greece

Informatics and Management Centre, Athens, Greece

Architectural Design

The Reconstruction and Conversion of a former Factory to a higher complexity Headquarters and Data Building required a delicate architectural approach defined by the bearing structure and restrictions of the existing building, the specifications of an up to date Digital Services building, as well as the functional requirements of a large scale building of this kind and its security demands.


The Complex is composed by the Office Spaces on the western and central parts, and the Main Service Building (Printing Centre and Digital Services) on the eastern part. The space in between is turned into a patio with planted trees, a key element of the complex. As for the illumination of the large surface of the office space, a set of four symmetrical solar chimneys has been invented to pass through all levels’ ceilings flooding with light.

The exterior aspect of the building complex is clearly defined by distinctive units, one multi storey part cladded with ceramic tiles on framework and one low rise long building with cement coating finishing and successive longitudinal openings that create a rhythm on the facade. Finally, 192 parking places are provided.

Piraeus Bank

Data Centre, Athens, Greece

Mechanical & Electrical Engineering

The Office building of the Piraeus Bank on Syngrou Avenue in Athens, includes Office spaces (4,500m²), a Data Center (500m²) and underground areas (1,500m²).

This state-of-the-art Data Centre was successfully completed in an unsuitable existing building.

The scope of work included: HVAC / Closed Control HVAC System / Water Supply / Sewage and Rainwater/ Fire Protection / Electrical substation / Lighting / Power Supply / Generators / UPS / Telephone - Data / Public Address / CCTV / Intrusion Alarm / Access Control / Building Management System / Lightning and Earthing.

Vodafone

Office Headquarters, Athens, Greece

Mechanical & Electrical Engineering

The Headquarters of Vodafone Greece have been placed on a total area of 39,840m², and a parking lot for 700 vehicles, in Halandri, Athens, Greece.

The challenge of this Project was that the structure had to allow various uses to take place in the same building (Headquarters building), like administration, offices, telephone operators, Data center, etc.

The scope of work included:
Water Supply / Sewage and Rainwater  / Fire Protection / HVAC / Lighting / Power / Electrical Substation / Telephones - Data / Sound Facilities / Lightning and Earthing / Elevators

Ioakimides Textiles

Headquarters, Storage & Distribution Centre, Greece

Architectural Design

The ‘bar code’ inspired elevations from a long sequence of solid and translucent surfaces in accordance to the functional needs of the building spaces. The building has two floor spaces and one basement total build area is 4,968m².

The company’s functions are divided into two groups: one for the administration and sale departments and the other for storage-logistics, packaging and distribution loading.

The two groups are arranged vertically into two parallel bars separated by a double height corridor with glazed fire proof partitions to allow full new of the companies activity by the administration department.

A twelve car parking is arranged in the basement along with all necessary M/E installation rooms. Loading and unloading facilities (yard, dock levelers etc) are provided as well as open air car parking.

Athens Stock Exhange

Office Building, Athens, Greece

Mechanical & Electrical Engineering

The office building of the Hellenic Exchanges S.A. (Athens Stock Exchange) is equipped with a 200-vehicles underground car park, in Athens, Greece.

The new Hellenic Exchanges Headquarters' Building with its marble facade was designed in close collaboration with the Client, in adherence to the most sophisticated and up-to-date technologies and standards, in order to accommodate the needs of the Greek stock market.

The scope of work included the following:
Water Supply / Sewage and Rainwater / Fire protection / HVAC / Lighting / Power / Electrical Substation / Telephone - Data / Public Address Systems / Lighting and Earthing / Elevators / Closed Control HVAC System

SATO Distribution Center

Central Warehouse, Goods Pick-up & Offices, Greece

Architectural Design

Sato’s new Distribution Centre was constructed in Elefsina’s industrial area. The plot occupies an area of 55,500m². In terms of functionality, morphology and construction it is divided in three parts: the central warehouse, the area dedicated to goods’ pick-up and shipment and the independent office building. The Central Warehouse, covering an area of 15,800m², has a fully automated VNA storage system. The Pick-Up and Delivery Area occupies three floors, each having a surface of 5,250m². The underground floor is dedicated to storage and is equipped with a ramp for large trucks. It also houses the electrical and mechanical infrastructure. On the ground floor there are 32 hydraulic ramps for loading and unloading purposes. The Office Building develops across four floors, 650m² each. The canteen, the restaurant, the assembly room and the archive are found on the underground level. The main entrance is located on the ground floor, complemented by delivery and pick-up offices on both sides. The first and second floors are occupied by offices. This building is morphologically differentiated from the other two, by the louvers on its south facade.

The project was a 50% in collaboration with ArchLab S.A.

Other Markets

​Industry & Science
bottom of page